Factory wholesale Spare Part Concrete Pump - Delivery Pipe – ANCHOR
Factory wholesale Spare Part Concrete Pump - Delivery Pipe – ANCHOR Detail:
|
Part number |
Type |
Thickness (mm) |
Length (mm) |
Weld-on ends |
Applicable pump |
Brands material |
|
SJT-1 |
DN125 (5″) |
4.0 |
3000 2000 1000 |
SK-148mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
ST52 ST37 20# Q235 |
|
SJT-2 |
DN125 (5″) |
4.5 |
SK-148mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
|
SJT-3 |
DN125 (5″) |
7.1 |
SK-148mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
|
SJT-4 |
DN125 (5″) |
4.0 |
Schwing F/M |
Schwing |
||
|
SJT-5 |
DN125 (5″) |
4.5 |
Schwing F/M |
Schwing |
||
|
SJT-6 |
DN125 (5″) |
7.1 |
Schwing F/M |
Schwing |
||
|
SJT-7 |
DN125 (5″) |
7.1 |
ZX-F/M |
Putzmeister |
||
|
SJT-8 |
DN100 (4″) |
4.0 |
122mm/ 127mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
|
SJT-9 |
DN100 (4″) |
4.5 |
122mm/ 127mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
|
SJT-10 |
DN100 (4″) |
6.0 |
122mm/ 127mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
|
SJT-11 |
DN80 (3″) |
4.0 |
98mm |
Schwing, Putzmeister CIFA Kyokuto Sany Zoomlion |
||
|
SJT-12 |
DN80 (3″) |
4.5 |
98mm |
Schwing, Putzmeister CIFA Kyokuto |
||
|
SJT-13 |
DN150 (6″) |
8.0 |
ZX-F/M |
Putzmeister |
||
|
SJT-14 |
DN150 (6″) |
8.0 |
3000 2000 1000 |
6HD |
Schwing, Putzmeister CIFA |
|
|
SJT-15 |
DN125 (5.5″) |
4.5 |
5HD |
Schwing, Putzmeister CIFA |
||
|
SJT-16 |
DN100 (4″) |
4.0 |
4HD |
Schwing, Putzmeister CIFA |
||
|
SJT-17 |
DN80 (3″) |
4.0 |
3HD |
Schwing, Putzmeister CIFA |
||
|
SJT-18 |
DN125 (5.5″) |
6.5 |
Sany- 157mm |
Sany |
||
|
SJT-19 |
DN125 (5.5″) |
6.5 |
ZoomlionF/ M-175mm |
Zoomlion |
||
|
SJT-20 |
We can also produce the special concrete pump delivery pipes, 2″-8″,length 500mm-6000mm,thickness:3mm-15mm, or according to the customer’s specific requirements. |
|||||
The product is made of the special material steel tubes,after quenching inside it.Carburizing chemical treatmeat,Flange sleeving,Its hardness reaches 58-62 degrees.The life of pipeline increases 3-5 time.So that can make users save time,Coat and the trouble of changing tubes and improve production efficiency.
SRUCTURE
|
Name |
Structure |
HRC |
Thickness mm |
Structure Sketch Map |
|
Base Material |
Pearlite & Ferrite |
23 |
2.5 |
Abrasionresist layer/ Crackresist layer |
Life Comparison & Quality
|
Name |
Material |
Structure |
Characteristic |
Life (squre) |
life (squre) |
|
Normal |
20 |
Monolayer |
Low cost,rapid abrasion,short life |
7000-8000 |
|
|
High Quality |
Alloysteel |
Monolayer |
High cost,long life |
20000-25000 |
|
|
Hardening (doublelayer) |
Alloysteel |
Double |
Higher cost with abrasion resist wall and crack resist ektexine.4-5 times longer life |
38000-45000 |
Product detail pictures:
Related Product Guide:
We keep on with our business spirit of "Quality, Performance, Innovation and Integrity". We goal to create much more worth for our customers with our rich resources, state-of-the-art machinery, experienced workers and exceptional providers for Factory wholesale Spare Part Concrete Pump - Delivery Pipe – ANCHOR , The product will supply to all over the world, such as: Turin , Berlin , Azerbaijan , We are looking forward to cooperating closely with you to our mutual benefits and top development. We guaranteed quality, if customers were not satisfied with the products' quality, you can return within 7days with their original states.
By Chris
from Mozambique
- 2018.02.21 12:14
Production management mechanism is completed, quality is guaranteed, high credibility and service let the cooperation is easy, perfect!
By Arlene
from Niger
- 2018.09.21 11:44












